The integrity of the original membrane surface and joints of the curb gutter and street remain intact and structurally sound and complete as when the job began.
Saw cutting and lifting are typically done throughout a neighborhood instead of at individual isolated locations.
As required for gutter flag width 175 7 slope 6 pavement t 4 0 2 1 1 tie bar pavement b c a tie bar r slope6 t d curb type.
Pavement tie bar t 1 3 2 1.
Utility contractor may saw cut a smooth line one 1 foot beyond each side of the disturbed base.
Use a carpenter s square to get around to the bottom.
It may be possible to saw cut a sidewalk trip hazard that is less than two inches 2 high or to lift sidewalks and gutters that have sunk.
Use the old adage measure twice and cut once then turn the gutter upside down on the table and mark it all the way around.
The repair or replacement of a deteriorated sidewalk drive approach and curb and gutter in a public way is the responsibility of the adjacent private property owner city ordinance 14 32 300.
If no damage to curb is evident to the city inspector the utility contractor may pump concrete under curb and gutter for cuts less than one 1 foot wide.
For construction of a driveway the curb shall be removed by saw cutting the gutter within 4 inches of the flow line.
Saw at 4 to 24 hours and seal.
This hand tooling may be neces s a r y even when a slipform paver is used.
Laying your gutter on the workbench measure off the amount of gutter you want to cut and mark it with a pencil.
If the gutter is in poor condition then it must be removed.
When existing sidewalk or driveway is removed cuts shall be made along scoring lines if the cut would fall within 12 inches of the scoring lines.
2 50 deep and seal.
The city inspector prior to concrete being placed.
Property owners may hire a contractor to accomplish the required concrete repairs which requires a permit to work in the public way or they may take.
Lifted or sunken concrete.
In minutes the hydraulically controlled saw is lowered in place and the cutting begins.
A single operator drives the curb cutting equipment to the site.
Joints can be tooled into the curb and gutter thus avoiding the nec e s s a r y waiting time re q u i r ed for saw cutting.
As required for gutter flag width slope5 am x.