Begin at the bottom edges of the roof and go up.
Installing tar paper on hip roof.
How to install roofing tar paper step 1.
Setting the roll and then nailing off.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Begin your first row of tar paper with the bottom of the tar paper.
This video walks through the very basic steps for installing tarpaper felt.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Never install the felt vertically across your roof.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
I swear it is the fastest way out there.
Staple it to the plywood with a staple gun placing the staples at 6 to 8 inch intervals along the edges and in the middle of the paper.
Use a tin snips to cut the drip edge to size.
This is how i paper my vallies.
After this lines should be snapped every 34 as you move up the roof.
Lay the first strip of tar paper side to side with its bottom.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof.
How to lay roofing felt on a hip roof.
Chalk lines should be snapped 33 5 8 above the eave line.
How to install roofing tar paper.
Measure the width and height of each section separately.
Measure the size of your roof in square feet.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
Multiply the width by the height for the.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Unroll the paper on the roof and cut it to the correct length with a utility knife.
Allow about 1 foot 0 30 m of the felt to hang over the hip.
Nail it every couple of feet.
Start at the bottom of one side of the roof at the right or left edge.
Lay the next strip.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
Adjust the felt as you roll it making sure that it s straight with no bubbling.
Then i run a r.
Starting a roof with tarpaper felt.
Use a ladder to reach the bottom level of the roof.