Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Installing roof sheathing by yourself.
If you need to reposition your gutters do so at this.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
We go in depth on how to install roof sheathing.
Use a tin snips to cut the drip edge to size.
Ensure roof trusses are in proper alignment with no curves or uneven sections when installing osb to sheathe roofs.
Thickness will range from 3 8 to 3 4 inch depending upon local code.
Starting with how to place the first row of sheathing we cover fastening methods the use of h clips stagg.
Avoid installing osb with the textured side down.
Avoid the errors described when installing this roof sheathing.
An air compressor with a nail gun will come in handy for nailing large flat areas like this.
Some roofers will use 15 pound 6 8 kg roofing paper which is an effective method although the best method is a self sealing membrane with a rain screen.
Also use more nails and place them closer together to build a stronger roof.
Install osb textured side up.
Nail it every couple of feet.
Start at the highest point and the furthest point from the trash container and take off all the old shingles flashing.
If you come across any large nails that are sticking out either remove them and put them in your debris container or.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Lay asphalt felt paper or special waterproof underlayment such as a self healing membrane over the roof.
Install osb panels on aligned roof trusses.
Curved or uneven roof trusses will cause osb roof sheathing to warp or buckle under roof coverings.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
When installing roof sheathing use nails with longer nail shank larger diameter and a larger head than may be required.
Choose an exterior c d grade.
Place the first screw.
Install the roofing screws vertically along each rib in the panel.