The boards install similarly to lap siding with an overlap of 9 inches giving you a 7 inch reveal in a staggered siding of varying sizes just like the real thing.
Installing cedar shake siding staggered.
Then install a 1 1 4 inch starter strip and an 8 1 4 inch starter course.
Cedar look staggered shake siding is available in boards 48 inches long and 16 inches high.
Nothing quite captures the ruggedness of cedar like staggered shake siding.
If you re using cedar shake siding for an entire wall start by installing a starter strip.
Ideal for whole house or accent applications double 7 staggered perfection shingles create a warm friendly look that is at the same time ruggedly beautiful.
Align the thick lower edge of a cedar shake at the lower edge of the.
The authentic cedar woodgrain provides the appearance of real wood while the staggered pattern creates an impression of cedar shingles that have been hand sawn and individually applied.
Remember a 1 4 inch clearance must be maintained between siding and trim and leave a 1 8 inch gap between siding and trim.
Position the panels so that the joint lines are staggered.
Be sure to align the bottom edges of trim and siding for best appearance.
How to install staggered cedar shake siding 1.
This will make more sense as it is seen on the actual wall when mounting the cedar shake siding.
It s a unique look that celebrates the uneven cuts random wood grain textures and offset spacing that makes hand split cedar shakes so dramatic and endearing.
If a staggered effect is desired lower the bottom the shingles to differing levels.
Shingles can be made to run in even rows or produce a staggered effect.
Apply overlapping horizontal rows of building paper onto the shear wall using a staple gun with 3 8 inch staples.
To keep the cedar shakes even align the bottoms of each shingle flush.
Start at the bottom of the wall at one end.
While shake and shingle siding are most often associated with cape cod style homes they can add instant character to any style home anywhere.
Lay out the courses on the wall using a chalk line to establish level reference lines.