Align the thick lower edge of a cedar shake at the lower edge of the.
Installing cedar shake siding instructions.
If you re using cedar shake siding for an entire wall start by installing a starter strip.
Position the panels so that the joint lines are staggered.
Define the bottom.
If you re thinking of installing shingle siding it s important to note that this option can be used only if the sheathing is boards plywood or osb.
Go back and nail subsequent nails along the top edge of this cedar shake siding piece.
How to install lp smartside trim siding.
Apply overlapping horizontal rows of building paper onto the shear wall using a staple gun with 3 8 inch staples.
How to install staggered cedar shake siding 1.
Install the windows and door jambs so you can trim the doors windows and corners of the house with wood trim.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
38 series cedar shake.
Using the nail gun drive a single nail at one end of a cedar shake piece of siding and then carefully align it along the snap line attaching another nail at the opposite end.
Lay out the courses on the wall using a chalk line to establish level reference lines.
How to install lp smartside trim siding.
Start at the bottom of the wall at one end.
For curb appeal that will make your house stand out in the neighborhood consider installing shingle siding.
Lp smartside strand substrate cedar shake.
Start at the bottom of the wall at one end.
Download our helpful installation instructions and watch our informative how to videos.
Flashing is an important line of defense in controlling moisture in wall assemblies.
Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or.