How to install elastomeric roof coating flat roofs duration.
Install tri built flat roofing.
Roof lays flat fix fishmouths replace broken or scuffed shingles shingles are sealed down flashings are secure with the homeowner check out the roof and the grounds get his her approval before leaving photos.
On re roofing applications remove old shingles nails and other loose materials.
Remove existing modified on flat roof and install new peel stick modified.
Prime with tri built quick dry primer or appropriate primer applied as per application and handling guidelines outlined in.
If the existing siding is damaged remove it and install tri built fanfold underlayment directly to the substrate.
Nail in place before applying the base ply.
When light metal wall ties or other structural metal are exposed on top of the wood deck cover them with a heavy ply of roofing membrane such as inverted tri ply bur granule cap sheet extending 2 6 51 152 mm beyond the metal in all directions.
As with all roofing materials always observe safe roofing.
Tri built synthetic underlayment can save you time and money with less material damage and fewer post install repairs.
Removing existing roof cover down to plywood reinstall existing plywood to code install new peel and stick roof pitch 3 12.
Cra rio remove existing roofing shingle and install 5v metal roof.
36 15 astm d4869 felt 432 sq.
App torch smooth 1 sq.
Stay on track take on more jobs and sleep assured knowing your tri built synthetic underlayment projects will remain intact.
Surecoat systems 726 780 views.
Roof proof hybrid underlayment 4 5 sq.
Granular surface self adhering ice water shield 2 sq.
Tri built roof x tender cool roof coatings duration.
Take photos of the finished roof installation for future reference.
Tri built beacon s own line of high quality building products deliver professional results at a competitive price.
Consult with your local sales repre sentative for further information.
Unlike traditional asphalt saturated felts tri built synthetic.
3 x 65 smooth seal ht underlayment.
Verify the application is compliant with applicable building codes.
Tri built underlayment is not designed or intended to be the final or primary roof.
Priming is generally not required but is recommended over dens deck concrete or masonry substrates or in coldweather.
Install the new siding material over tri built fanfold underlayment in.