While the vertical leg should be placed 1 4 1 2 away from the fascia.
How to install roof felt and drip edge.
Does the drip edge metal go under the tarpaper ice and water shield or underlayment on the eave.
Place the drip.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
According to most building codes and manufacturer recommendations the drip edge should be installed beneath the underlayment along the eaves of the roof.
Cut a length of drip edge when needed with a pair or tin snips.
As seen in m.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
If it doesn t pull the drip edge out slightly from under the shingles.
But over the underlayment along the rake edges of the roof.
Secure the drip edge with roofing cement.
Understanding the proper way to install the drip edge will only get you so far.
As always thanks for watching.
Get the real story about drip edge placement.
Overlap joints where two pieces meet by about 1 inch.
Install drip edges on the eaves first.
Make sure the outer edge extends over the gutter.
Does drip edge go over or under felt.
12 roof repair tips.
Nail it in place with 1 inch roofing nails.
In this video i just show a quick install of some drip edging and how to cut corners.
Catch you on the next one.
Find and fix a leaking roof step 2.