For roof installations use the pbr panel which has a purlin bearing leg to provide greater support at the laps.
How to install r panel roofing.
Now we can install our roof panels.
To prevent corrosion immediately remove any loose metal shavings left on roof surface.
As a general principle the less steep the.
Drive through the outside closure and the ribs of the panel beneath.
After installing roof remove any debris such as.
Bend the flashing into a v shape to fit over the top roof ridge and the corners where the panels meet.
Make sure the panel is square to the eave of the roof so that all of panels installed afterwards are straight.
And for any exposed fasteners try to avoid over tightening them.
Moreover try to ensure that the screws are all aligned evenly.
Along the fastening strip of the sl16 always use the pancake head fastener.
It s ideal for retro fitting over existing composition shingles and it saves time labor and disposal costs which means a lower total project cost.
Roof pitch our roofing panels require a certain degree of pitch to ensure proper water drainage.
This means that the minimum roof slope required for all panels is 1 inches of rise per foot.
Choose from many designer colors for a sleek attractive appearance.
See panel squaring method in this manual.
Preformed valley trim panel wood screw panel.
The flashing should overlap the edge of the roof by one inch to help direct.
Next put a screw into the fastening strip to keep it steady before installing the screws along the face.
R panel requires a minimum pitch of 1 12.
The ir panel is used on side walls only.
5 outside closure install along upper edge of panels about 2 below the edge.
Flashing is metal trim that fits over joints where two sections of roof meet.
It helps direct water away from the.
4 panel wood screw space according to recommended fastening pattern and local codes.
You will use metal roofing screws to secure the metal panels to the sheathing.
Try to space the screws about 12 inches apart down the entire piece of metal.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Install the roof substrate according to local building code requirements.