The drip edge should be nailed beneath the builder s felt but over the fascia board.
How to install flashing on a roof edge.
The remaining siding on the sidewall will overlap the step flashing and nail.
Drive the nail through the drip edge into the roof surface not through the fascia.
Roof shingle over step flashing.
How to install drip edge flashing on a roof step 1.
Tack the edge in place with a roofing nail every foot or so.
Step flashing on roof peak.
Start the installation at the lower edge of the roof and work your way up toward the peak.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Cover the nail heads with roofing cement and stick the felt down.
Lift the shingles and slide the top flange of the drip edge underneath.
Select enough lengths of.
Install the step flashing when the siding is installed it should be tucked behind this piece and then consecutive courses lapped over it.
After you ve correctly installed the valley flashing you can install the drip edge which is corner shaped and will be attached with nails along the edge of the roof.