Remove the cemented roof tiles starting from the top of the roof.
How to fix roof tiles at the edge.
Drip edge roof flashing types.
Their position at the edge.
Also look for pulled or missing nails at the base s bottom edge.
The edge of a pitched roof as it meets the gable end is called a verge.
Look at the advanced weather forecast before you begin and choose a few weeks with as many dry days as possible.
This is important to protect damage to your fascia soffits rafters.
Secure the underlayment with nails that are at least 2 inches from the edge of the roof.
Sean the painter shares his thoughts on flashing under the edge tiles on the roof before replacing the facia boards and priming before painting the house.
Dry fix options for verges are also available from a number of manufacturers.
You might be tempted to throw caulk at the problem but that solution won t last long.
Repair loose or cracked cement roof tiles by lifting up adjacent tiles and sliding new tiles under the wooden batten that holds the tiles to the roof.
To begin remove the old roof tile.
Step by step how to repair a roof edge.
Tools supplies tin sn.
Replace them with rubber washered screws.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
Tiles on the verge are often mortared to prevent rain and wind from getting underneath the tiles.
The eaves at the bottom of a roof and the gable ends that run up the slope are often the first to show signs of rot and damage.
L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg.
Remove the under boards that were used to support the underside of the cemented tiles.
If you don t know what the tile is take a tile with you to a roofing supplier and they should be able to match it for you.
The most common tile types are concrete and terracotta.
Chisel off any cement from the tiles replace any that break.
1 put on heavy work gloves and safety glasses.
Check for cracked housings on plastic roof vents and broken seams on metal ones.
Installing drip edge on your roof.
Replace the under boards with either slate or cement fibre boards fix directly to batons or timber rafter not to the barge board.
With without rain gutters.